国内某在役核电厂蒸汽发生器二次侧沉积物的表征分析
王国华, 张东平, 杨越, 李世伟, 张挺, 梁媛媛, 邓传东
Characterization of secondary side deposits in steam generators at an operating nuclear power plant in China
Wang Guohua, Zhang Dongping, Yang Yue, Li Shiwei Zhang Ting, Liang Yuanyuan, Deng Chuandong
冶金分析 . 2026, (8): 1 -6 .  DOI: 10.13228/j.boyuan.issn1000-7571.013091